U.S. NUMBERS

DCs
by the Numbers.

Compare enterprise and edge, colocation, hyperscale, and AI campuses. Adjust the assumptions, then see how power, water, jobs, taxes, and local purchasing roll up together.

Adjust the tally
Editorial illustration of four data center facility types connected to power, water, native landscapes, and local communities
4

facility types
one national view

01 / FEDERAL + INDUSTRY BENCHMARKS

Start with what is measured.

The latest comprehensive federal usage report is based on 2023 data. These are reference points—not outputs from the adjustable model below.

DOE/LBNL 2028 electricity range

325–580 TWh, or about 6.7%–12% of U.S. electricity.

Open the LBNL report ↗

02 / DC BY THE #’S

Build a transparent national scenario.

Starting values are calibrated to sit near the 2023 national electricity and direct-water benchmarks. They are not a verified count of U.S. facilities.

Sites represented

1,740sites

Annual electricity

174.2TWh

Direct water

17.3B gal/yr

Build job assignments

532,500jobs

Ongoing on-site roles

45,100roles

Annual local tax

$4.1Bmodeled
01

Enterprise + edge

Smaller facilities close to users or dedicated to one organization.

Electricity15.9 TWh
Direct water2B gal
Build jobs82,500
Ongoing roles13,200
Edit per-site assumptions +
02

Colocation + regional

Shared facilities serving many customers from one building or campus.

Electricity73.3 TWh
Direct water9.1B gal
Build jobs200,000
Ongoing roles17,500
Edit per-site assumptions +
03

Hyperscale

Large cloud and platform facilities designed for massive scale.

Electricity59.1 TWh
Direct water4.4B gal
Build jobs180,000
Ongoing roles10,800
Edit per-site assumptions +
04

AI + GPU campus

Very high-density computing built for accelerated AI workloads.

Electricity25.9 TWh
Direct water1.8B gal
Build jobs70,000
Ongoing roles3,600
Edit per-site assumptions +
Current four-model scenario
Facility modelSitesConnected loadAnnual energyAnnual waterBuild jobsOngoing rolesAnnual taxVendor spend
Enterprise + edge1,1003,300 MW15.9 TWh2B gal82,50013,200$550M$880M
Colocation + regional50013,500 MW73.3 TWh9.1B gal200,00017,500$1.5B$1.8B
Hyperscale1209,000 MW59.1 TWh4.4B gal180,00010,800$1.4B$960M
AI + GPU campus203,600 MW25.9 TWh1.8B gal70,0003,600$560M$360M
Total1,74029,400 MW174.2 TWh17.3B gal532,50045,100$4.1B$4B